jig-harness/jig
Jig as a software factory · before the line

Deciding what to build: the feature pipeline.

Before an item reaches the line, a team decides what to build and how. A feature or an epic, a set of work items each delivered as its own pull request, passes through stages. A reviewer checks each stage before the next one uses it.

What it hands the line is accepted requirements and architecture, decision records, an accepted design, an epic of planned work items. Both parts, in figure 2.

The feature pipeline, stage by stagefive stages, each reviewed before the next uses it
On the roadmap: roadmap 3the greenfield kickoff
  1. 1ResearchRun by a skill: explainhands ona dated research note
  2. 2RequirementsRun by a persona personhands onthe PRD
  3. 3ArchitectureRun by a skill: adrhands onthe architecture, with its ADRs
  4. 4PrototypeUI work onlyRun by a skill: design-brief-builderhands onthe accepted prototype
  5. 5Plan and fileRun by a persona personOn the roadmap: roadmap, Laterepic planning on the trackerhands onan epic of planned work items
At every stageadversarial review → iterate until cleared → de-scarRun by a skill: reviewagainst the repository's decisionsRun by a skill: decidea dilemma: ruled, or escalatedRun by a skill: red-teamrequirements and architecture, by personaRun by a persona personaccepts each stage's artifact
  1. 1

    Research. A dated research note per question: the options, the evidence and a recommendation. Research that changes a decision becomes an architecture decision record, an ADR.

  2. 2

    Requirements. A product requirements document, the PRD, says what the feature does for its users, from the committed template. It names no technology.

  3. 3

    Architecture. How the team builds it, from the template. Its significant decisions become ADRs.

  4. 4

    Prototype (user-interface work only). A brief, a generated prototype, an adversarial review by a strong reviewer agent, and another round. The prototype often improves the requirements and the architecture, so both stay open. The team imports the accepted prototype in a standard form, and checks again what it means for the architecture.

  5. 5

    Plan and file. An epic of work items, each with a clear plan. Flag labels, such as a migration, an API change or a person’s decision, decide which gates fire further down the line.

At every stage, a reviewer reads the artifact as an adversary, and the author iterates until it clears. Then the author de-scars it: the final artifact states only what is true now, and the findings stay in the review threads and issues.

The skills that run stations at this level:

Run by a persona personA person sets the intent, accepts each stage’s artifact and takes the decisions decide escalates.