Run the kickoff, and hand each phase to the module that governs it.
Starting a new project with Jig from day one. The entry point is a structured kickoff that produces the first delivery artifacts, followed by adopting the profile’s modules at their target maturity from the start.
Two pieces cooperate:
- the kickoff methodology in seeds/project-kickoff/ — an 11-phase bootstrap that takes a project from “an idea” to “tracker populated, ready to build”;
- the modules — the operating system for everything after the kickoff ends, led by M6, whose templates are the canonical form of the artifacts the kickoff’s discovery phases produce.
Where the seed and a module disagree, the module wins — the seed is the imported starting point; the modules carry the maintained contract.
The kickoff’s phases each produce an artifact or scaffold that a module governs from then on. Run the phases; reach for the mapped module’s template and gates as you go.
- 1Requirements discoveryProduces: first PRD draftHands over toM6M6 —
prd-template.md(what for users) - 2Technical architectureProduces: first architecture draftHands over toM6M6 —
architecture-template.md(how) - 3Critical analysis (fresh session, red-team)Produces: critique of 1–2Hands over toM6M6’s per-stage adversarial review — the fresh-context reviewer is this phase, made routine;
/jig:red-teamruns it by persona, once on the PRD and once on the architecture, into one findings report each - 4SynthesisProduces: accepted PRD + architectureHands over toM6M6 — de-scar and mark
accepted(the stage-review-record gate) - 5
- 6
- 7
- 8Scaffold the projectProduces: running skeletonHands over tonot a Jig modulestack-specific (derive the stack; not a Jig module)
- 9
- 10
- 11Populate the trackerProduces: filed, labelled workHands over toM9M9 — label taxonomy + issue templates; flag labels set here drive downstream gates
The kickoff’s Lite/Standard/Enterprise tiers map directly onto Jig’s profiles — pick the profile during phase 5 and adopt its modules at their target maturity from the start.
- 1
Run the kickoff (seeds/project-kickoff/), reaching for each mapped module’s template above. The two discovery outputs (PRD, architecture) come from M6’s templates, and the phase-3 red-team pass is M6’s per-stage adversarial review done in a fresh session — an agent that just wrote a doc will defend it, so the reviewer starts clean.
/jig:red-teamruns that pass, one persona per fresh session or subagent. - 2
Pick a profile and adopt its modules at target maturity during the repo-bootstrap phase: instruction file + glossary (M0), gate set + CI (M1), derived-file inventory (M2), and — for Team/Standard and up — docs governance (M4), ADRs (M5), the delivery pipeline (M6), the PR loop (M7), tracker discipline (M9), and the test tiers and testing rules (M14).
- 3
Wire the learning loop early (even Lite): a place to file misses and the habit of turning them into checks (M8) costs almost nothing on day one and compounds forever. If you run several agents on one machine, adopt M12’s port allocator and heavy-run mutex before the collisions start.
The kickoff methodology ends where a project starts (tracker populated, plans reviewed). The modules are the operating system for everything after: keeping instructions fresh, gates honest, docs governed, reviews layered, and the process learning. Greenfield projects get both for the price of following the kickoff’s bootstrap phases with the module templates at hand — the kickoff bootstraps, and M6’s pipeline is what every feature after the first one flows through.