One line for every change, kept moving when nobody is there.
Agents open pull requests faster than a team can review them. Each agent session starts cold, forgets what it learned when it ends, and stops only at the checks that exist. When nobody is at the keyboard, the work waits: an assigned item, a review that hit a usage limit, the follow-up a merge owes.
A software factory holds the work. Work enters in a standard form and passes through the same stations and the same checks every time. It comes out measured, so the output stays predictable as the volume grows. This page follows one work item along the line first. Then it shows what runs the line with nobody at the keyboard, how a team decides what to build, and what every station stands on.
The detailed contracts are in the modules: the feature pipeline is M6, the pull-request loop is M7 and the learning loop is M8. The mechanism map says which parts of each station are scripts with no model in them and which are a model deciding. Every term of art is in the glossary.
The same skills, sorted by what a team gets from each: What you get →
The dispatcherstarts stations 1, 4 and 7 when nobody is at the keyboard · a person merges
↺ the learning loop wraps both parts · follow-ups re-enter at 1
- Parallel workspacesneeds stated inM12
- Environments and deploymentneeds stated inM10
- Measurementneeds stated inM11
- Supply chainneeds stated inM1M7
The factory, page by page
- 1The linethe stations one work item passes from pickup to follow-up, who runs each and what each hands on, and the pull-request loop they run
- 2With nobody at the keyboardthe dispatcher: what it starts every few minutes, what reaches a person, the outcome log and its dashboard, accounts and their usage limits, and what it never does
- 3Deciding what to buildthe feature pipeline, from research to an epic of planned work items
- 4What it stands onthe jobs a repository's scaffolding does, the modules that build each, and what Jig provides
- 5The loop that sharpens ithow a miss a station should have caught becomes a proven check
- 5Plan and fileRun by a persona personOn the roadmap: roadmap, Laterepic planning on the trackerhands onan epic of planned work items
- 1Pick upRun by a skill: do-itemRun by a tool: launcherthe “open in coding agent” button in Linearhands ona branch, a workspace and a plan
- 2BuildRun by a skill: do-itemRun by a skill: reviewhands onthe change, reviewed before its first push
- 4DriveRun by a skill: drive-prRun by a skill: resolve-review-commentsRun by an agent: review-arbiterhands onevery finding with one outcome
- 5RepairRun by a skill: drive-prRun by a skill: resolve-conflictsRun by a skill: fix-cihands ona green head without conflicts
- 6MergeRun by a persona personOn the roadmap: roadmap 9a converged drive arming the merge it certifiedwould change “a person merges”; decided on its ownhands ona merged pull request
- 7Follow upRun by a tool: repository follow-upthe plugin's followup skill unless the repository names its own; started by a person or the dispatcherRun by a skill: followupRun by a persona personStarted by a tool: dispatcherstarts the repository's follow-up commandhands onfollow-up items, back to station 1
The upper rail, at station 6, Merge: a person merges
- 1Pick up: pickup
- 4Drive: re-arm · re-drive
- 7Follow up: follow-up
The dispatcher starts these stations when nobody does, every few minutes. It never merges. ↺ Follow-up items enter the line again at station 1.
| Deciding what to build | The line | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Who | 1Research | 2Requirements | 3Architecture | 4Prototype | 5Plan and file | ·every stage | 1Pick up | 2Build | 3Open | 4Drive | 5Repair | 6Merge | 7Follow up |
| Run by a skill: explain | explain at Research | ||||||||||||
| Run by a skill: adr | adr at Architecture | ||||||||||||
| Run by a skill: design-brief-builder | design-brief-builder at Prototype | ||||||||||||
| Run by a skill: review | review at every stage | review at Build | |||||||||||
| Run by a skill: decide | decide at every stage | ||||||||||||
| Run by a skill: red-team | red-team at every stage | ||||||||||||
| Run by a skill: do-item | do-item at Pick up | do-item at Build | do-item at Open | ||||||||||
| Run by a skill: work-batch | work-batch at Open | ||||||||||||
| Run by a skill: drive-pr | drive-pr at Drive | drive-pr at Repair | |||||||||||
| Run by a skill: resolve-review-comments | resolve-review-comments at Drive | ||||||||||||
| Run by a skill: resolve-conflicts | resolve-conflicts at Repair | ||||||||||||
| Run by a skill: fix-ci | fix-ci at Repair | ||||||||||||
| Run by a skill: followup | followup at Follow up | ||||||||||||
| Run by an agent: review-arbiter | review-arbiter at Drive | ||||||||||||
| Run by a tool: launcher | launcher at Pick up | ||||||||||||
| Started by a tool: dispatcher | the dispatcher starts Pick up | the dispatcher starts Drive | the dispatcher starts Follow up | ||||||||||
| Run by a tool: repository follow-up | repository follow-up at Follow up | ||||||||||||
| Run by a persona person | a person at Requirements | a person at Plan and file | a person at every stage | a person at Merge | a person at Follow up | ||||||||
| on the roadmap | Lon the roadmap: epic planning on the tracker at Plan and file | 9on the roadmap: a converged drive arming the merge it certified at Merge | |||||||||||
This part of the factory hands the line its work:
A significant miss, one an automated step should have caught, becomes a check (M8). The team classifies the miss, rebuilds it as a test case that replays it, and answers it with an added check. The check gates only once it catches its test cases. Its recall, precision and cost then decide whether it is kept, promoted or removed. So the line gets sharper without anyone watching harder.
Jig automates the stations and keeps these decisions with people:
- Stays with a person: The intent: what to build, and the acceptance of each design stage.
- Stays with a person: The dilemmas
decideescalates, and the review findings a drive marks for a person. - Stays with a person: The answer to a parked question, and what to do about a stage that drifts.
- Stays with a person: The merge. Delegating it, for a repository that chooses to, is on the roadmap.
- Stays with a person: Promotion to production (M10).
- Stays with a person: Changes to the scaffolding that agents propose from their own sessions (M8).
The machines, environments, deployment and monitoring a factory runs on are not Jig’s. Each module states what the repository needs from them, so any platform can supply it:
- Parallel workspaces: many agents on one machine without colliding (M12). A team installs the plugin once per machine. It needs no setup per workspace in a tool that starts sessions with the user’s own agent configuration: Herdr, Orca, Conductor and others. A runner with its own configuration directory, a container, or a tool without plugin support needs the setup the plugin describes.
- Environments and deployment: verify what merged, ship only what was verified, promote by hand, and use disposable preview environments (M10).
- Measurement: the delivery process emits typed events, so review quality, gate health and cycle time are measured rather than assumed (M11).
- Supply chain: third-party automation pinned and updated, and dependencies held back by a release cooldown and an install-script allowlist. Secrets are scanned in layers, and reviewers are wired so the change under review cannot alter them (M1, M7).
Each item is a requirement a module states, not a missing feature: Jig names what the repository needs from the platform and stops there.